Friday, March 1, 2013
What's on my Needles!
I am knitting Diabolical. It uses a gradiance yarn from The Unique Sheep and the pattern is by Threebagsfulled. I love the pattern and the yarn is wonderful to work with. Linking up with Patchwork Times
Thursday, February 28, 2013
Get it Done - March
I did not make a list in February as I did not get to do much sewing in January and had not finished that list. I did finish the star quilt and sent to the quilter and made 2 blocks from the Gypsy Wife bom. I finished the cowgirl quilt and gifted it. Not on the list but finished was Madrona Rd. challenge quilt.
Four things I would like to get done this month are the
1. Summer Sampler quilt backing and binding
2. Finish baby quilt for my nephew
3. Quilt and bind a donation quilt for bumble beans
4. Get the top done on the starburst quilt.
Hopefully these things can get done this month and I can get back on track.
Cowgirl quilt
Four things I would like to get done this month are the
1. Summer Sampler quilt backing and binding
2. Finish baby quilt for my nephew
3. Quilt and bind a donation quilt for bumble beans
4. Get the top done on the starburst quilt.
Hopefully these things can get done this month and I can get back on track.
Cowgirl quilt
Star quilt. This is 110" square
Tuesday, January 1, 2013
Get it done January
This is a list of 4 quilty things I would like to get done in January.
1. Finish the binding on the cowgirl quilt.
2. 2 blocks from Gypsy Wife BOM
3. Attach last border on my star quilt and make backing.
4. Make backing and binding for summer sampler quilt.
I don't know how much time I will have this month as I will be spending a lot of time taking care of my mom.
Subscribe to:
Posts (Atom)